Ontario Design Studio provides BCIN-certified building permit drawings for projects in the City of Markham. Our team is experienced with Markham's building department submission requirements, York Region coordination, and local zoning bylaws.
Do You Need a Building Permit in Markham? The Short Answer
Markham accepts building permit applications only through its ePLAN portal, and a secondary suite needs fire registration in addition to the building permit — a step homeowners routinely miss. Most of Markham falls within TRCA jurisdiction. Ontario Design Studio prepares the BCIN-certified ePLAN-ready package in 5–10 business days and handles the submission and examiner responses.
- Do I need a building permit?
- Yes for a second unit, an addition, structural change, a new kitchen or bathroom, or new walls that create rooms. Purely cosmetic work - paint, flooring, trim - generally does not.
- Who can prepare the drawings?
- A BCIN-certified designer or a licensed architect or engineer. The BCIN must be declared on Schedule 1 with the application.
- Where is the application filed?
- the City of Markham’s ePLAN portal (electronic submission).
- Municipal review time
- 10 business days for houses once a complete application is filed, per Ontario’s prescribed review periods.
- Permit fee
- Set by the municipal fee schedule by project type and floor area, with a minimum permit fee. Confirm current rates before budgeting.
- Additional residential units
- Under Ontario’s housing legislation, up to three residential units are permitted as-of-right on most lots — a main dwelling plus two additional residential units, such as a basement apartment and a garden suite.
- Permit + fire registration
- A Markham secondary suite needs more than a building permit — the City also requires fire registration for the unit. We prepare both sides of that package.
- Conservation authority
- Properties on regulated land need sign-off from the Toronto and Region Conservation Authority (TRCA), which covers most of Markham including the Rouge River watershed and Rouge National Urban Park.
- Drawing turnaround
- 5–10 business days for most residential packages from Ontario Design Studio, with rush available.
Rules and fees are set by the City of Markham and can change — confirm current figures before budgeting, or call 416-558-9607 and we will check them for your address. Last reviewed: .
Going deeper? Read Legal Basement Apartment Requirements in Ontario (2026), or get a fixed quote on your project: free quote form · 416-558-9607.
Markham Permit Services
- Residential permits - homes, additions, renovations
- Legal basement apartment conversions
- Secondary suites and garden suites
- Commercial permits
- Deck and porch permits
Markham-Specific Notes
- York Region: Projects may require coordination with York Region for water and sewer services
- Heritage Markham: Properties in heritage conservation districts require additional review
- Markham Centre: Development in Markham's urban growth centre may have additional design guidelines
What Zoning Rules Apply to Your Markham Property?
Every Markham project is measured against the City’s zoning by-law, which sets the permitted use, setbacks, building height, lot coverage and parking for your specific property. Markham is still consolidating a number of older area-specific by-laws into a single comprehensive by-law, so the rules that apply can differ between an established street in Thornhill or Markham Village and a newer subdivision in Cornell or Greensborough. Before we draw a single line, we confirm exactly which zoning provisions govern your lot.
If a design does not meet the by-law — an addition too close to a side lot line, a second storey above the height limit, or lot coverage over the maximum — the project needs a minor variance from Markham’s Committee of Adjustment. We identify that early, so you can decide whether to redesign to comply or budget the extra time a variance adds. Properties in Markham’s heritage conservation districts and lands near the Rouge River valley or the Rouge National Urban Park can carry additional review, which we flag during the initial zoning check.
How Does the Markham Building Permit Process Work?
The City of Markham accepts building permit applications electronically through its ePLAN portal. A complete residential application typically includes a site plan based on a legal survey, existing and proposed floor plans, elevations, cross-sections, structural details, and energy-efficiency compliance documentation - all prepared to Ontario Building Code standards by a qualified designer.
- Zoning check: we confirm your project complies with Markham's zoning by-law (setbacks, height, lot coverage) before drawing a single line.
- Drawing preparation: our BCIN-certified team prepares the complete, Markham-formatted drawing package (typically 5–10 business days).
- ePLAN submission: we package and upload your application, respond to examiner comments, and manage resubmissions if needed.
- Permit issued & inspections: once construction starts, you book City inspections at required milestones through to final sign-off.
Secondary Suites in Markham: Permit + Fire Registration
Markham is one of the GTA's strongest markets for basement apartments and secondary suites. Two things set Markham apart from neighbouring municipalities:
- A building permit is mandatory for creating or legalizing any secondary suite, reviewed against OBC requirements for ceiling heights, fire separation, egress, smoke/CO alarms, and HVAC.
- All secondary suites must also be registered with Markham Fire & Emergency Services - a step many homeowners miss. An unregistered suite is not legal in Markham even if it was built with a permit. The City publishes an official building permit guide covering Additional Residential Units and secondary suites.
We prepare the complete drawing package for both the permit and fire-registration requirements, so your suite is fully legal - protecting your insurance coverage, financing, and resale value.
Markham Neighbourhoods We Serve
We prepare building permit drawings right across Markham, from the heritage streets of Unionville and Markham Village to the established homes of Thornhill and Milliken Mills, and the newer communities of Cornell, Berczy Village, Greensborough, Cathedraltown, Angus Glen and Cachet. Older neighbourhoods tend toward basement and second-unit conversions, rear additions and garage rebuilds, while newer subdivisions more often bring finished basements, decks and interior renovations — and we tailor each drawing package to the housing stock and lot conditions of your specific street.
Ready to start your Markham project?
Ontario Design Studio delivers BCIN-certified, OBC-compliant building permit drawings across Markham and York Region. Call 416-558-9607 or request your free quote - most drawing packages are ready in 5–10 business days.
What’s Included in Your Markham Drawing Package
Every Markham permit set we issue is complete on arrival — the whole point is that the plan examiner has nothing left to ask for:
- Site plan drawn from your legal survey, showing setbacks, lot coverage, grading and parking
- Existing and proposed floor plans, fully dimensioned, with room areas and uses
- Exterior elevations and building cross-sections
- Fire separation and egress details — ratings, window sizes, sill heights, smoke and carbon monoxide alarm locations
- Structural details, with P.Eng-stamped drawings where the work requires them
- Energy compliance (SB-12) and mechanical/ventilation design
- Schedule 1 – Designer Information carrying our BCIN registration and qualified classes of design activity
- Zoning summary confirming conformity with the Markham by-law
How Long Does a Markham Building Permit Take?
Ontario sets the review clock, not the municipality. Under the Ontario Building Code (O. Reg. 163/24), a municipality must review a complete application within a prescribed number of business days — and issue the permit or state its objections. The words that matter are complete and business days: an incomplete or wrongly formatted package never starts the clock, and a deficiency response restarts the cycle.
| Project class | Prescribed review period | Typical Markham example |
|---|---|---|
| House | 10 business days | Basement apartment, addition, deck, interior renovation |
| Small building | 15 business days | Small commercial unit, low-rise multi-unit |
| Large building | 20 business days | Larger commercial or industrial building |
| Complex building | 30 business days | Assembly, institutional and high-rise projects |
A complete first submission is what starts that clock in City of Markham. Our job is to make the first submission complete, so the statutory clock starts on day one instead of after a round of corrections. Call 416-558-9607 if you have a closing date or tenant date driving your schedule.
Why Markham Homeowners Choose Ontario Design Studio
- BCIN-certified. Provincially registered and verifiable through the Ministry’s public QuARTS registry — not a drafter working under someone else’s number.
- We file it, not you. We act as your agent from application through to permit, including every plan examiner comment.
- 5–10 business days on most residential packages, with rush available when a closing or tenant date is fixed.
- Zoning checked before drafting. If your design cannot comply we tell you at the start and set out the minor variance route, rather than discovering it at review.
- Rejected sets welcome. If another designer’s package was refused, we diagnose, correct and resubmit it.
- Fixed written quotes. No hourly surprises — you know the fee before we start.
Get Your Free Markham Permit Quote
Tell us about your project — quotes go out within 24 hours of receiving your complete project information. No obligation. Fields marked * are required.
Frequently Asked Questions
Do I need a building permit for a basement apartment in Markham?
Yes. Markham requires a building permit for any new or existing secondary suite, plus mandatory registration with Markham Fire & Emergency Services. Both steps are required before the unit is legal.
How do I apply for a building permit in Markham?
Applications are submitted electronically through the City of Markham's ePLAN portal. We prepare your complete drawing package and handle the electronic submission and examiner responses as part of our service.
How long does a building permit take in Markham?
Ontario legislation targets a 10-business-day review for houses once a complete application is submitted. Incomplete drawings restart the clock - which is why a professionally prepared, complete first submission matters.
Do I need a permit for a deck in Markham?
Generally yes if the deck is attached to the house, larger than 10 m² (108 sq. ft.), or raised significantly above grade. See our deck permit guide for the full rules.
What does a permit drawing package cost in Markham?
It depends on project type and complexity. See our 2026 permit cost guide or call 416-558-9607 for a free quote on your specific project.
What if my Markham project does not meet the zoning by-law?
You would apply for a minor variance through Markham’s Committee of Adjustment. We flag any non-compliance — setbacks, height, lot coverage — during our zoning check so you can choose to redesign to comply or plan for the extra time a variance hearing adds.
Which conservation authority covers Markham?
Most of Markham falls within the Toronto and Region Conservation Authority (TRCA), and much of the city drains to the Rouge River and the Rouge National Urban Park. If your property is near a valley, watercourse or floodplain, a TRCA permit may be required alongside your City building permit — we identify this early and coordinate the drawings accordingly.
Does building in a Markham heritage district need extra approval?
Yes. Markham has designated heritage conservation districts in Unionville, Markham Village and Thornhill, and work that affects the exterior in these areas is reviewed by Heritage Markham in addition to the standard building permit. We design with those guidelines in mind so the two approvals move together rather than in conflict.
How much do building permit drawings cost in Markham?
Drawing fees depend on the scope of work, not on your postal code - a basement apartment package differs from a two-storey addition. Design fees are separate from the municipal permit fee. Read the 2026 building permit cost guide to see what drives the cost, or call 416-558-9607 for a fixed quote on your Markham project - within 24 hours of receiving your complete project information.
How fast can I get permit drawings in Markham?
Most Markham residential drawing packages are ready in 5–10 business days from the site measure. Rush turnaround is available when a closing date, a tenant or a contractor's schedule is driving the timeline - tell us the date you need and we will confirm whether we can meet it before you commit.
Do you handle the Markham permit submission, or just the drawings?
Both. We act as your agent: we prepare the BCIN-certified drawings, file the application through the City of Markham's ePLAN portal, electronic submission only, track it, and answer every plan examiner comment until the permit is issued. You do not have to learn the portal or interpret a deficiency notice - that is the part most homeowners find hardest, and it is included.
My Markham permit application was rejected. Can you fix it?
Yes - it is one of the most common reasons people call us. We read the deficiency notice, identify what actually failed (usually zoning non-compliance, a missing fire separation or egress detail, incomplete structural information, or a formatting problem caught at intake), correct the set to Ontario Building Code standards and resubmit under our BCIN. See permit rejected? we fix and resubmit or call 416-558-9607.
Do I need a BCIN designer for a Markham building permit?
Yes, in almost every case. Under the Ontario Building Code, permit drawings must be prepared by a designer registered under the province's Building Code Identification Number (BCIN) system, or by a licensed architect or professional engineer, and the designer's BCIN and qualified classes of design activity must be declared on Schedule 1 with the Markham application. The homeowner exemption is narrow and does not cover the structural and fire-separation work most second units, additions and basement entrances involve. Ontario Design Studio is BCIN-registered and verifiable through the Ministry's public QuARTS registry.
Helpful Resources
- Legal Basement Apartment Requirements Ontario (2026)
- How Long Does a Building Permit Take in Ontario?
- Permit Rejected? We Fix and Resubmit
Nearby Cities We Also Serve
Building outside Markham? Ontario Design Studio prepares building permit drawings across Ontario — view every city and region we serve.