Ontario Design Studio provides BCIN-certified building permit drawings for projects in Mississauga. From residential additions to legal basement apartments and commercial fit-outs, we prepare OBC-compliant drawings tailored to the City of Mississauga's building department requirements and Peel Region regulations.
Do You Need a Building Permit in Mississauga? The Short Answer
In Mississauga you need a building permit for a second unit, an addition, a structural change, or any new kitchen, bathroom or bedroom-forming wall. The drawings must be prepared by a BCIN-certified designer or licensed professional and filed through the City’s ePlans portal — paper applications are not accepted. Ontario Design Studio prepares the complete ePlans-ready package in 5–10 business days and handles the submission and examiner comments for you.
- Do I need a building permit?
- Yes for a second unit, an addition, structural change, a new kitchen or bathroom, or new walls that create rooms. Purely cosmetic work - paint, flooring, trim - generally does not.
- Who can prepare the drawings?
- A BCIN-certified designer or a licensed architect or engineer. The BCIN must be declared on Schedule 1 with the application.
- Where is the application filed?
- the City’s ePlans portal (online only — no paper submissions).
- Municipal review time
- 10 business days first review for new residential and residential alterations; 15 for a second unit; 20 for non-residential.
- City / Town permit fee
- Minimum $244 residential / $386 non-residential, plus a non-refundable $50 electronic pre-screening fee
- Additional residential units
- Up to two additional residential units. Building permit fees are refunded, and second and third ARUs are exempt from most municipal charges.
- Second-unit registration
- Mandatory. After inspections pass, proof of ownership and the signed permit go to the City’s second-unit registry — an unregistered unit is not a legal unit.
- Conservation authority
- Properties on regulated land need sign-off from Credit Valley Conservation (CVC) across the Credit River watershed, and TRCA in the east around Etobicoke Creek.
- Permit drawing cost
- Quoted per property after a free review — size, structure and existing conditions vary from site to site. The written quote includes filing and examiner responses. Permit costs in Mississauga.
- Drawing turnaround
- 5–10 business days for most residential packages from Ontario Design Studio, with rush available.
Rules and fees are set by the City of Mississauga and can change — confirm current figures before budgeting, or call 416-558-9607 and we will check them for your address. Last reviewed: .
Going deeper? Read Mississauga Building Permit Guide 2026 and Legal Basement Apartments in Mississauga: Rules, Cost & Registration, or get a fixed quote on your project: free quote form · 416-558-9607.
How Much Does a Building Permit Cost in Mississauga (2026)?
Short answer: there are two separate costs — the municipal permit fee paid to the City of Mississauga, and the design fee for your drawings. The city fee comes from a published schedule; the design fee depends on your property, so we quote it individually.
1. The Mississauga permit fee
The City of Mississauga calculates its permit fee as a rate per square metre of the work, under Building By-law 0236-2024 (2026 schedule, effective February 1, 2026 to January 31, 2027):
| Work | City fee (2026) |
|---|---|
| New house — detached, semi, townhouse, duplex (incl. garden suites) | $18.99/m² |
| Residential addition | $13.96/m² |
| Additional residential unit inside an existing building | $11.33/m² plus the minimum residential fee |
| Finishing a basement (detached, semi, townhouse, duplex) | $5.64/m² |
| Interior alterations and partitioning (residential) | $6.84/m² plus the minimum applicable fee |
| Deck, porch or basement walkout/stairwell to a house | $244 each |
| Minimum fee — residential projects under Part 9 | $244 |
| Electronic pre-screening of the request | $50, non-refundable |
Worked example from the City’s rates: finishing a 70 m² basement is 70 × $5.64 = $394.80. Building or legalizing an ARU? The City refunds the building permit fee once the unit is built and passes all inspections. Sources: City of Mississauga 2026 building fees · ARU fee refund.
2. The drawing (design) fee
There is no honest one-size price for permit drawings, because no two properties are the same. What moves the number:
- Size and scope — a one-room renovation and a two-storey addition need very different drawing sets.
- Structure — beams, removed walls, underpinning or a new walk-out need structural design, sometimes a P.Eng stamp.
- Existing conditions — ceiling height, window sizes and what is already built decide how much has to change.
- Zoning and other approvals — setbacks, a minor variance, conservation-authority, heritage or tree permits add work.
- Survey and as-built information — whether a usable survey and existing drawings are available.
We review your property, then send a free written quote that includes filing through the City’s ePlans portal and answering the plan examiner’s comments.
Recently Approved by the City of Mississauga
Two of our recent Mississauga permit sets, both approved by the City’s Building Division (client details removed for privacy):
Mississauga Permit Services
- Residential permits - new homes, additions, renovations
- Legal basement apartments in Mississauga - second unit registration and permit drawings
- Commercial permits - retail, restaurant, office fit-outs
- Secondary suites and garden suites
- Deck permits
- Multiplex conversions
Mississauga-Specific Requirements
- Second Unit Registration: Mississauga requires registration of second units (basement apartments) with the city, in addition to the building permit
- Peel Region Services: Projects involving water and sewer connections may require coordination with Peel Region
- Heritage Properties: Properties in Mississauga heritage conservation districts need additional review
How Does the Mississauga Building Permit Process Work?
Mississauga requires all building permit applications to be submitted online through the City's ePlans portal - there are no paper submissions. A complete application includes a site plan from a legal survey, existing and proposed floor plans, elevations, sections, structural details, and energy compliance documents, prepared to Ontario Building Code standards.
- Zoning check: we confirm setbacks, lot coverage, height, and parking against Mississauga's zoning by-law before design begins.
- Drawing preparation: our BCIN-certified team prepares the complete ePlans-formatted package (typically 5–10 business days).
- ePlans submission: we create and manage the application, upload drawings in the City's required format, and respond to examiner comments.
- Inspections & registration: after construction, City inspections sign off - and for second units, we guide you through the final registration step.
Mississauga Permit Timelines & Fees
Mississauga publishes its own review targets. Critically, the review clock only starts once your application clears pre-screening - which is exactly why a complete, correctly formatted first submission matters:
| Project type | First review (complete application) | Average total time to permit |
|---|---|---|
| New residential (detached, semi) | 10 business days | ~13 weeks |
| Second unit (basement apartment) | 15 business days | ~10 weeks |
| Residential alteration | 10 business days | ~7 weeks |
| New non-residential | 20 business days | ~12 weeks |
| Non-residential alteration | 20 business days | ~9 weeks |
Pre-screening alone takes roughly 7 to 10 business days, and each resubmission cycle can add two or more weeks. Mississauga also charges a non-refundable $50 electronic pre-screening fee on each application.
Legal Second Unit Requirements in Mississauga
A Mississauga basement apartment is only legal if it meets the Ontario Building Code’s second-unit standards. These are the specifications your drawings must demonstrate:
- Ceiling height: minimum 1.95 m (6′4¾″) over the required floor area. In an attic unit, at least 50% of the required floor area must have 2.03 m (6′8″), and areas under 1.4 m do not count.
- Escape windows (basement/ground floor): unobstructed openable area of at least 0.38 m² (4.1 sq ft), with the openable portion 460 mm (18″) or more, and the sill no higher than 900 mm above the floor or steps.
- Escape windows (upper floors): at least 1,060 mm high and 560 mm wide, with the same 900 mm maximum sill height.
- Fire separation: a 30-minute fire separation between units and between units and common areas - reducible to 15 minutes where the entire house has interconnected smoke alarms.
- Alarms: smoke alarms on every level, in each bedroom, outside sleeping areas and in shared common areas; carbon monoxide alarms near sleeping areas where there is a fuel-fired appliance or an attached garage.
- Minimum room sizes: living area 13.5 m², master bedroom 9.8 m², other bedrooms 7 m², kitchen 4.2 m².
Miss any one of these and the unit cannot be registered - which is why we design to them from the first sketch. See our legal basement apartment guide for Mississauga.
Mississauga ARUs: Permit Fees Refunded
Mississauga is actively encouraging additional residential units. If you own a detached, semi-detached, or townhouse home, you can build up to two ARUs - inside the home (like a basement apartment) or as a detached garden suite. Two financial advantages worth knowing, per the City's ARU program:
- Building permit fees are refunded when you build or legalize an ARU
- Second and third ARUs are exempt from most municipal charges
After inspections pass, second units are registered by emailing proof of ownership and the inspector-signed permit to the City's second-unit registry - a step we walk every client through, because an unregistered unit isn't a legal unit.
Ready to start your project?
Ontario Design Studio delivers BCIN-certified, OBC-compliant building permit drawings across Ontario and the GTA. Call 416-558-9607 or request your free quote.
Get Your Free Mississauga Permit Quote
Tell us about your project — quotes go out within 24 hours of receiving your complete project information. No obligation. Fields marked * are required.
Frequently Asked Questions
How long does a building permit take in Mississauga?
The City of Mississauga typically reviews residential permit applications in 10–15 business days and commercial applications in 20–30 business days. Complex projects or applications with deficiencies may take longer.
Can I build a second unit (basement apartment) in Mississauga?
Yes. Mississauga's zoning bylaw permits second units (basement apartments) in most residential zones. Key requirements include minimum ceiling height, fire separation, egress windows, and separate entrance access. See our dedicated Mississauga basement apartment page for details.
Are Mississauga permit fees really refunded for ARUs?
Yes - the City refunds building permit fees when you build or legalize an additional residential unit, and second and third ARUs are exempt from most municipal charges. It's one of the GTA's most homeowner-friendly ARU policies.
How do I register my second unit in Mississauga?
After your permit work passes all inspections, registration is completed by emailing proof of ownership and the inspector-signed permit documentation to the City's second-unit registry. We guide every basement apartment client through this final step.
Can I submit a paper permit application in Mississauga?
No - Mississauga accepts applications only through its online ePlans portal. We handle the entire electronic submission for you, including drawing formats and examiner responses.
How much does a building permit cost in Mississauga?
Mississauga applies a minimum permit fee of $244 for residential properties and $386 for non-residential, with the exact amount set by project type and floor area under the City’s fee schedule. The City also charges a non-refundable $50 electronic pre-screening fee.
What is the minimum ceiling height for a basement apartment in Mississauga?
The Ontario Building Code requires a minimum ceiling height of 1.95 m (6′4¾″) over the required floor area of a second unit. Beams and ductwork may project slightly lower. In an attic unit, at least 50% of the required floor area must have a 2.03 m ceiling. If your basement is close to the limit, we assess it before you commit to construction.
What if my Mississauga project does not meet the zoning by-law?
Where a design cannot meet a zoning standard — setback, height, lot coverage or parking — you would apply for a minor variance through Mississauga’s Committee of Adjustment before the permit is issued. We flag any non-compliance during the zoning check, so you can choose to redesign to comply or plan for the extra time a variance hearing adds.
Which conservation authority covers Mississauga?
Mississauga is split between two authorities: Credit Valley Conservation (CVC), which covers the Credit River watershed across most of the city, and the Toronto and Region Conservation Authority (TRCA) in the east around Etobicoke Creek. If your property is near the Credit River, Etobicoke Creek or another regulated watercourse or valley, a conservation authority permit may be required alongside your City building permit — we identify this during the initial review.
Do I need a permit to finish my basement in Mississauga?
If you are adding a second dwelling unit, a bathroom or kitchen, new walls that create rooms, or altering the structure, you need a building permit - and Mississauga requires the drawings to be submitted through ePlans. Purely cosmetic work (paint, flooring, trim) generally does not. If you are unsure, send us your plan and we will tell you exactly what the City will require.
Who prepares building permit drawings in Mississauga?
Building permit drawings must be prepared by a qualified designer registered under Ontario's Building Code Identification Number (BCIN) system, or a licensed architect/engineer. Ontario Design Studio is BCIN-certified and prepares the full ePlans-ready set - site plan, floor plans, elevations, sections and energy compliance - for Mississauga projects.
How much do building permit drawings cost in Mississauga?
Drawing fees are not one-size-fits-all: they depend on the size of the project, whether structural design is needed and the existing conditions on your property, so Ontario Design Studio quotes every Mississauga project individually, in writing, after a free review. The quote includes filing through the City’s ePlans portal and responding to examiner comments. The municipal permit fee is separate. In 2026 the City charges by floor area — for example $5.64/m² to finish a basement or $13.96/m² for a residential addition — with a $244 minimum for houses, and it refunds the permit fee for ARUs once they pass inspection. See permit costs in Mississauga or call 416-558-9607.
How fast can I get permit drawings in Mississauga?
Most Mississauga residential drawing packages are ready in 5–10 business days from the site measure. Rush turnaround is available when a closing date, a tenant or a contractor's schedule is driving the timeline - tell us the date you need and we will confirm whether we can meet it before you commit.
Do you handle the Mississauga permit submission, or just the drawings?
Both. We act as your agent: we prepare the BCIN-certified drawings, file the application through the City's ePlans portal - online only, no paper submissions, track it, and answer every plan examiner comment until the permit is issued. You do not have to learn the portal or interpret a deficiency notice - that is the part of the job most homeowners find hardest, and it is included.
My Mississauga permit application was rejected. Can you fix it?
Yes - it is one of the most common reasons people call us. We read the deficiency notice, identify what actually failed (usually zoning non-compliance, a missing fire separation or egress detail, incomplete structural information, or a formatting problem caught at intake), correct the set to Ontario Building Code standards and resubmit under our BCIN. See permit rejected? we fix and resubmit or call 416-558-9607.
Do I need a BCIN designer for a Mississauga building permit?
Yes, in almost every case. Under the Ontario Building Code, permit drawings must be prepared by a designer registered under the province's Building Code Identification Number (BCIN) system, or by a licensed architect or professional engineer, and the designer's BCIN and qualified classes of design activity must be declared on Schedule 1 with the Mississauga application. The homeowner exemption is narrow and does not cover the structural and fire-separation work most second units, additions and basement entrances involve. Ontario Design Studio is BCIN-registered and verifiable through the Ministry's public QuARTS registry.
Helpful Resources
- Legal Basement Apartments in Mississauga
- Legal Basement Apartment Requirements Ontario (2026)
- Permit Rejected? We Fix and Resubmit
Mississauga Neighbourhoods We Serve
Port Credit, Streetsville, Cooksville, Meadowvale, Erin Mills, Clarkson, Lorne Park, Mineola, Lakeview, Malton, Mississauga Valley, and all other areas within Mississauga.
Local Permit Guides for Peel & Halton
- Brampton second units & garden suites
- Burlington building permit guide
- Oakville legal basement vs personal-use basement
- Milton building permit guide
Nearby Cities We Also Serve
Building outside Mississauga? Ontario Design Studio prepares building permit drawings across Ontario — view every city and region we serve.

