Skip to main content
BCIN Certified #129736•OBC-Compliant Permit Drawings•Mon–Fri 9am–6pm
Ontario Design Studio
Service Area · Mississauga

Mississauga Building Permit Drawings by a BCIN Designer

BCIN-certified permit drawings for Mississauga homeowners — basement apartments, second units, additions and decks, with a free written quote for your property. We file through the City’s ePlans portal and answer every examiner comment. Drawings in 5–10 business days.

✓ BCIN Certified✓ OBC-Compliant✓ 5–10 Day Turnaround

How It Works

From first call to approved permit

1

Free Consult & Quote

Tell us about your project and get a clear, fixed quote — within 24 hours of receiving your complete project information.

2

Site Measure & Review

We measure existing conditions and check zoning and Ontario Building Code requirements.

3

OBC-Compliant Drawings

We prepare a complete permit set built to pass examiner review the first time.

4

Submit & Get Approved

We submit to your municipality and handle any deficiency responses through to permit.

Ontario Design Studio provides BCIN-certified building permit drawings for projects in Mississauga. From residential additions to legal basement apartments and commercial fit-outs, we prepare OBC-compliant drawings tailored to the City of Mississauga's building department requirements and Peel Region regulations.

Why Mississauga homeowners choose us ✓ BCIN-certified & OBC-compliant ✓ ePlans-ready submissions ✓ 5–10 day turnaround ✓ We handle examiner comments See our recent permit projects and read client reviews.

Do You Need a Building Permit in Mississauga? The Short Answer

In Mississauga you need a building permit for a second unit, an addition, a structural change, or any new kitchen, bathroom or bedroom-forming wall. The drawings must be prepared by a BCIN-certified designer or licensed professional and filed through the City’s ePlans portal — paper applications are not accepted. Ontario Design Studio prepares the complete ePlans-ready package in 5–10 business days and handles the submission and examiner comments for you.

Do I need a building permit?
Yes for a second unit, an addition, structural change, a new kitchen or bathroom, or new walls that create rooms. Purely cosmetic work - paint, flooring, trim - generally does not.
Who can prepare the drawings?
A BCIN-certified designer or a licensed architect or engineer. The BCIN must be declared on Schedule 1 with the application.
Where is the application filed?
the City’s ePlans portal (online only — no paper submissions).
Municipal review time
10 business days first review for new residential and residential alterations; 15 for a second unit; 20 for non-residential.
City / Town permit fee
Minimum $244 residential / $386 non-residential, plus a non-refundable $50 electronic pre-screening fee
Additional residential units
Up to two additional residential units. Building permit fees are refunded, and second and third ARUs are exempt from most municipal charges.
Second-unit registration
Mandatory. After inspections pass, proof of ownership and the signed permit go to the City’s second-unit registry — an unregistered unit is not a legal unit.
Conservation authority
Properties on regulated land need sign-off from Credit Valley Conservation (CVC) across the Credit River watershed, and TRCA in the east around Etobicoke Creek.
Permit drawing cost
Quoted per property after a free review — size, structure and existing conditions vary from site to site. The written quote includes filing and examiner responses. Permit costs in Mississauga.
Drawing turnaround
5–10 business days for most residential packages from Ontario Design Studio, with rush available.

Rules and fees are set by the City of Mississauga and can change — confirm current figures before budgeting, or call 416-558-9607 and we will check them for your address. Last reviewed: .

Going deeper? Read Mississauga Building Permit Guide 2026 and Legal Basement Apartments in Mississauga: Rules, Cost & Registration, or get a fixed quote on your project: free quote form · 416-558-9607.

How Much Does a Building Permit Cost in Mississauga (2026)?

Short answer: there are two separate costs — the municipal permit fee paid to the City of Mississauga, and the design fee for your drawings. The city fee comes from a published schedule; the design fee depends on your property, so we quote it individually.

1. The Mississauga permit fee

The City of Mississauga calculates its permit fee as a rate per square metre of the work, under Building By-law 0236-2024 (2026 schedule, effective February 1, 2026 to January 31, 2027):

WorkCity fee (2026)
New house — detached, semi, townhouse, duplex (incl. garden suites)$18.99/m²
Residential addition$13.96/m²
Additional residential unit inside an existing building$11.33/m² plus the minimum residential fee
Finishing a basement (detached, semi, townhouse, duplex)$5.64/m²
Interior alterations and partitioning (residential)$6.84/m² plus the minimum applicable fee
Deck, porch or basement walkout/stairwell to a house$244 each
Minimum fee — residential projects under Part 9$244
Electronic pre-screening of the request$50, non-refundable

Worked example from the City’s rates: finishing a 70 m² basement is 70 × $5.64 = $394.80. Building or legalizing an ARU? The City refunds the building permit fee once the unit is built and passes all inspections. Sources: City of Mississauga 2026 building fees · ARU fee refund.

2. The drawing (design) fee

There is no honest one-size price for permit drawings, because no two properties are the same. What moves the number:

We review your property, then send a free written quote that includes filing through the City’s ePlans portal and answering the plan examiner’s comments.

Get my free Mississauga quote

Recently Approved by the City of Mississauga

Two of our recent Mississauga permit sets, both approved by the City’s Building Division (client details removed for privacy):

Approved home addition permit drawings, City of Mississauga
Home addition — approved. 697 ft² first-floor addition (new primary suite, sunroom, reconfigured kitchen), approved September 2025.
Approved garage conversion permit drawings, City of Mississauga
Garage conversion — approved. Garage to heated living space with R60 ceiling and R20 walls, approved September 2025.

See the full permit drawing portfolio →

Mississauga Permit Services

Mississauga-Specific Requirements

How Does the Mississauga Building Permit Process Work?

Mississauga requires all building permit applications to be submitted online through the City's ePlans portal - there are no paper submissions. A complete application includes a site plan from a legal survey, existing and proposed floor plans, elevations, sections, structural details, and energy compliance documents, prepared to Ontario Building Code standards.

  1. Zoning check: we confirm setbacks, lot coverage, height, and parking against Mississauga's zoning by-law before design begins.
  2. Drawing preparation: our BCIN-certified team prepares the complete ePlans-formatted package (typically 5–10 business days).
  3. ePlans submission: we create and manage the application, upload drawings in the City's required format, and respond to examiner comments.
  4. Inspections & registration: after construction, City inspections sign off - and for second units, we guide you through the final registration step.

Mississauga Permit Timelines & Fees

Mississauga publishes its own review targets. Critically, the review clock only starts once your application clears pre-screening - which is exactly why a complete, correctly formatted first submission matters:

Project typeFirst review (complete application)Average total time to permit
New residential (detached, semi)10 business days~13 weeks
Second unit (basement apartment)15 business days~10 weeks
Residential alteration10 business days~7 weeks
New non-residential20 business days~12 weeks
Non-residential alteration20 business days~9 weeks

Pre-screening alone takes roughly 7 to 10 business days, and each resubmission cycle can add two or more weeks. Mississauga also charges a non-refundable $50 electronic pre-screening fee on each application.

Legal Second Unit Requirements in Mississauga

A Mississauga basement apartment is only legal if it meets the Ontario Building Code’s second-unit standards. These are the specifications your drawings must demonstrate:

Miss any one of these and the unit cannot be registered - which is why we design to them from the first sketch. See our legal basement apartment guide for Mississauga.

Mississauga ARUs: Permit Fees Refunded

Mississauga is actively encouraging additional residential units. If you own a detached, semi-detached, or townhouse home, you can build up to two ARUs - inside the home (like a basement apartment) or as a detached garden suite. Two financial advantages worth knowing, per the City's ARU program:

After inspections pass, second units are registered by emailing proof of ownership and the inspector-signed permit to the City's second-unit registry - a step we walk every client through, because an unregistered unit isn't a legal unit.

Ready to start your project?

Ontario Design Studio delivers BCIN-certified, OBC-compliant building permit drawings across Ontario and the GTA. Call 416-558-9607 or request your free quote.

Get Your Free Mississauga Permit Quote

Tell us about your project — quotes go out within 24 hours of receiving your complete project information. No obligation. Fields marked * are required.

📞 Call 416-558-9607

Frequently Asked Questions

How long does a building permit take in Mississauga?

The City of Mississauga typically reviews residential permit applications in 10–15 business days and commercial applications in 20–30 business days. Complex projects or applications with deficiencies may take longer.

Can I build a second unit (basement apartment) in Mississauga?

Yes. Mississauga's zoning bylaw permits second units (basement apartments) in most residential zones. Key requirements include minimum ceiling height, fire separation, egress windows, and separate entrance access. See our dedicated Mississauga basement apartment page for details.

Are Mississauga permit fees really refunded for ARUs?

Yes - the City refunds building permit fees when you build or legalize an additional residential unit, and second and third ARUs are exempt from most municipal charges. It's one of the GTA's most homeowner-friendly ARU policies.

How do I register my second unit in Mississauga?

After your permit work passes all inspections, registration is completed by emailing proof of ownership and the inspector-signed permit documentation to the City's second-unit registry. We guide every basement apartment client through this final step.

Can I submit a paper permit application in Mississauga?

No - Mississauga accepts applications only through its online ePlans portal. We handle the entire electronic submission for you, including drawing formats and examiner responses.

How much does a building permit cost in Mississauga?

Mississauga applies a minimum permit fee of $244 for residential properties and $386 for non-residential, with the exact amount set by project type and floor area under the City’s fee schedule. The City also charges a non-refundable $50 electronic pre-screening fee.

What is the minimum ceiling height for a basement apartment in Mississauga?

The Ontario Building Code requires a minimum ceiling height of 1.95 m (6′4¾″) over the required floor area of a second unit. Beams and ductwork may project slightly lower. In an attic unit, at least 50% of the required floor area must have a 2.03 m ceiling. If your basement is close to the limit, we assess it before you commit to construction.

What if my Mississauga project does not meet the zoning by-law?

Where a design cannot meet a zoning standard — setback, height, lot coverage or parking — you would apply for a minor variance through Mississauga’s Committee of Adjustment before the permit is issued. We flag any non-compliance during the zoning check, so you can choose to redesign to comply or plan for the extra time a variance hearing adds.

Which conservation authority covers Mississauga?

Mississauga is split between two authorities: Credit Valley Conservation (CVC), which covers the Credit River watershed across most of the city, and the Toronto and Region Conservation Authority (TRCA) in the east around Etobicoke Creek. If your property is near the Credit River, Etobicoke Creek or another regulated watercourse or valley, a conservation authority permit may be required alongside your City building permit — we identify this during the initial review.

Do I need a permit to finish my basement in Mississauga?

If you are adding a second dwelling unit, a bathroom or kitchen, new walls that create rooms, or altering the structure, you need a building permit - and Mississauga requires the drawings to be submitted through ePlans. Purely cosmetic work (paint, flooring, trim) generally does not. If you are unsure, send us your plan and we will tell you exactly what the City will require.

Who prepares building permit drawings in Mississauga?

Building permit drawings must be prepared by a qualified designer registered under Ontario's Building Code Identification Number (BCIN) system, or a licensed architect/engineer. Ontario Design Studio is BCIN-certified and prepares the full ePlans-ready set - site plan, floor plans, elevations, sections and energy compliance - for Mississauga projects.

How much do building permit drawings cost in Mississauga?

Drawing fees are not one-size-fits-all: they depend on the size of the project, whether structural design is needed and the existing conditions on your property, so Ontario Design Studio quotes every Mississauga project individually, in writing, after a free review. The quote includes filing through the City’s ePlans portal and responding to examiner comments. The municipal permit fee is separate. In 2026 the City charges by floor area — for example $5.64/m² to finish a basement or $13.96/m² for a residential addition — with a $244 minimum for houses, and it refunds the permit fee for ARUs once they pass inspection. See permit costs in Mississauga or call 416-558-9607.

How fast can I get permit drawings in Mississauga?

Most Mississauga residential drawing packages are ready in 5–10 business days from the site measure. Rush turnaround is available when a closing date, a tenant or a contractor's schedule is driving the timeline - tell us the date you need and we will confirm whether we can meet it before you commit.

Do you handle the Mississauga permit submission, or just the drawings?

Both. We act as your agent: we prepare the BCIN-certified drawings, file the application through the City's ePlans portal - online only, no paper submissions, track it, and answer every plan examiner comment until the permit is issued. You do not have to learn the portal or interpret a deficiency notice - that is the part of the job most homeowners find hardest, and it is included.

My Mississauga permit application was rejected. Can you fix it?

Yes - it is one of the most common reasons people call us. We read the deficiency notice, identify what actually failed (usually zoning non-compliance, a missing fire separation or egress detail, incomplete structural information, or a formatting problem caught at intake), correct the set to Ontario Building Code standards and resubmit under our BCIN. See permit rejected? we fix and resubmit or call 416-558-9607.

Do I need a BCIN designer for a Mississauga building permit?

Yes, in almost every case. Under the Ontario Building Code, permit drawings must be prepared by a designer registered under the province's Building Code Identification Number (BCIN) system, or by a licensed architect or professional engineer, and the designer's BCIN and qualified classes of design activity must be declared on Schedule 1 with the Mississauga application. The homeowner exemption is narrow and does not cover the structural and fire-separation work most second units, additions and basement entrances involve. Ontario Design Studio is BCIN-registered and verifiable through the Ministry's public QuARTS registry.

Helpful Resources

Mississauga Neighbourhoods We Serve

Port Credit, Streetsville, Cooksville, Meadowvale, Erin Mills, Clarkson, Lorne Park, Mineola, Lakeview, Malton, Mississauga Valley, and all other areas within Mississauga.

Local Permit Guides for Peel & Halton

Nearby Cities We Also Serve

Building outside Mississauga? Ontario Design Studio prepares building permit drawings across Ontario — view every city and region we serve.

Get a Free Quote in 24 Hours

Tell us what you’re building - we send your quote within 24 hours of receiving your complete project information.

Request Your Free Quote 📞 Call 416-558-9607