Building Permit Services in Ontario
Ontario Design Studio provides comprehensive building permit drawing services for commercial and residential projects across Ontario. Every drawing is prepared by our BCIN-certified designer and meets Ontario Building Code (OBC) requirements, giving your project the best chance of a smooth, first-time permit approval.
Residential Building Permit Services
Our residential building permit services cover all types of home construction and renovation projects. Whether you're building a new home, planning an addition, converting your basement, or adding a deck, we prepare the complete drawing package required by your municipality.
Specialized Residential Services
- Legal Basement Apartment Permits — fire separation, egress windows, energy compliance, separate entrance options
- Secondary Suite & Garden Suite Permits — ADUs, coach houses, laneway housing
- Deck & Porch Permits — attached decks, elevated decks, covered structures
- Duplex, Triplex & Multiplex Permits — up to 4 units per lot under Ontario's 2023 housing policy
- Garden Suite & Laneway House Permits — standalone backyard homes
- Load Bearing Wall Removal Permits — coordinated with P.Eng structural design
- Interior Renovation Permits — layout changes, plumbing relocation, structural modifications
- Basement Separate Entrance Permits — stairwell construction, grading, waterproofing
- Basement Underpinning Permits — ceiling height increase with structural coordination
Commercial Building Permit Services
We prepare permit drawings for retail stores, restaurants, offices, medical clinics, and mixed-use developments. Our commercial packages include full OBC life safety compliance, accessibility reviews under the Ontario Building Code Part 3 requirements, and coordination with mechanical and electrical consultants.
{CTA_BLOCK}What's Included in Our Drawing Package
Every permit drawing package from Ontario Design Studio includes the following deliverables, prepared to OBC standards and ready for municipal submission:
- Site Plan: Property boundaries, building location, setbacks, lot coverage, parking, grading
- Floor Plans: Existing and proposed layouts with room dimensions, door/window locations, and fixture placement
- Elevations: All exterior faces showing height, materials, window/door positions, and grade relationship
- Cross-Sections: Building cut-through showing ceiling heights, structural assembly, insulation, and foundation details
- Structural Details: Connection details, beam schedules, and load path information
- Energy Compliance: SB-10 or SB-12 forms as required by the Ontario Building Code
- Schedule 1: Designer information form required for all Ontario permit submissions
- Zoning Summary: Compliance check against applicable municipal zoning bylaw
Our Drawing Process
Learn about our complete workflow in our step-by-step permit process guide. We start with a free consultation, conduct site measurements, prepare your drawing package in 5–10 business days, and support you through municipal submission and any deficiency responses.
Pricing
Building permit drawing costs vary by project type and complexity. See our complete 2026 pricing guide for detailed cost breakdowns by project type. We offer free, no-obligation quotes for every project.
Service Areas
We serve all Ontario municipalities. Our team is especially experienced with building departments in Toronto, Mississauga, Brampton, Markham, Vaughan, Hamilton, Oakville, and Burlington. View all service areas →
Frequently Asked Questions
What building permit services does Ontario Design Studio offer?
We offer comprehensive building permit drawing services including residential permits (homes, additions, renovations), commercial permits (retail, restaurant, office), legal basement apartments, secondary suites, garden suites, deck permits, multiplex conversions, load bearing wall removals, interior renovations, basement separate entrances, and basement underpinning.
What is included in a building permit drawing package?
Every permit drawing package includes a site plan, floor plans (existing and proposed), exterior elevations, building cross-sections, structural details, energy compliance documentation (SB-10 or SB-12), Schedule 1 designer information form, and a zoning compliance summary. Additional items depend on your project type.
How long does it take to get building permit drawings?
Ontario Design Studio typically delivers permit-ready drawings in 5–10 business days depending on project complexity. Rush turnaround is available for urgent projects. Municipal review then takes an additional 10–30 business days depending on your municipality.