Scarborough’s large lots and bungalow stock make it one of Toronto’s busiest areas for basement apartments and additions. As part of the City of Toronto, every project is governed by City-wide Zoning By-law 569-2013 and reviewed by Toronto Building.
Do You Need a Building Permit in Scarborough? The Short Answer
Scarborough is part of the City of Toronto, so your permit is issued by Toronto Building under the Toronto Zoning By-law — which now allows secondary suites, laneway suites, garden suites and multiplexes of up to four units on most residential lots. Near the Bluffs, the Rouge or Highland Creek, slope-stability review and a TRCA permit can run alongside it. Ontario Design Studio prepares the BCIN-certified set in 5–10 business days and files it for you.
- Do I need a building permit?
- Yes for a second unit, an addition, structural change, a new kitchen or bathroom, or new walls that create rooms. Purely cosmetic work - paint, flooring, trim - generally does not.
- Who can prepare the drawings?
- A BCIN-certified designer or a licensed architect or engineer. The BCIN must be declared on Schedule 1 with the application.
- Where is the application filed?
- Toronto Building’s online building permit application system.
- Municipal review time
- 10 business days for houses once a complete application is filed, per Ontario’s prescribed review periods.
- Permit fee
- Set by Toronto’s building permit fee schedule, calculated on floor area by occupancy and work type.
- Additional residential units
- Toronto permits secondary suites, laneway suites and garden suites, and allows multiplexes of up to four units on most residential lots.
- Ravine & valley regulation
- Work near the Bluffs or the shoreline can require geotechnical slope-stability review and a TRCA permit in addition to the building permit — we flag it before you apply.
- Conservation authority
- Properties on regulated land need sign-off from the Toronto and Region Conservation Authority (TRCA), on lands near the Rouge River, Highland Creek and the Scarborough Bluffs.
- Drawing turnaround
- 5–10 business days for most residential packages from Ontario Design Studio, with rush available.
Rules and fees are set by the City of Scarborough and can change — confirm current figures before budgeting, or call 416-558-9607 and we will check them for your address. Last reviewed: .
Going deeper? Read Toronto Building Permit Guide (2026), or get a fixed quote on your project: free quote form · 416-558-9607.
Building Permit Services in Scarborough
Whatever you are building in Scarborough, our BCIN-certified team prepares the complete, Ontario Building Code–compliant drawing package your project needs:
- Residential permits - new homes, additions, and renovations
- Legal basement apartment conversions
- Secondary suites and garden suites
- Deck and porch permits
- Load-bearing wall removals with structural engineering
- Commercial permits and tenant fit-outs
What Local Rules Affect Permits in Scarborough?
- Scarborough Bluffs: properties near the Bluffs and the Lake Ontario shoreline can be subject to slope-stability review and TRCA permits in addition to the building permit.
- Bungalow & back-split stock: ideal for legal basement apartments and second units with a separate entrance.
- Ravine lots: lands near the Rouge River and Highland Creek valleys may fall under conservation regulation.
Ready to start your Scarborough project?
Ontario Design Studio delivers BCIN-certified, OBC-compliant permit drawings across Scarborough and the surrounding area. Call 416-558-9607 or request your free quote - most drawing packages are ready in 5–10 business days.
What Zoning Rules Apply to Your Scarborough Property?
Zoning is the first hurdle, and it is settled before the Ontario Building Code review even begins. Scarborough is governed by the City of Toronto’s harmonized City-wide Zoning By-law 569-2013, which replaced the former Scarborough by-laws after amalgamation, although a handful of properties still carry site-specific or legacy provisions. The by-law fixes your setbacks, building height, lot coverage, floor-space index and permitted uses.
If a design does not comply, Toronto Building cannot issue the permit — the drawings have to be revised, or you apply to the Committee of Adjustment for a minor variance (appealable to the Toronto Local Appeal Body), which adds months. On Scarborough’s wide suburban lots this comes up most often for deeper rear additions, garden suites near the rear lot line, and work close to the Bluffs setback. We pull your zone’s numbers and size the design to comply before drafting begins.
How Does the Scarborough Building Permit Process Work?
Every building permit in Scarborough is reviewed by Toronto Building against the Ontario Building Code and the City-wide Zoning By-law 569-2013. Ontario legislation targets a 10-business-day review for houses once a complete application is filed, so a complete, professional first submission is the fastest route to approval. For the full City of Toronto process and fees, see our Toronto building permit drawings page.
- Zoning check - we confirm setbacks, height, and lot coverage before drawing a single line.
- Drawing preparation - your complete, Toronto-formatted package, typically in 5–10 business days.
- Submission - we file through the City’s online permit system and respond to examiner comments.
- Permit & inspections - you build, with City inspections through to final sign-off.
Second Units, Laneway & Garden Suites in Scarborough
Toronto permits secondary suites, laneway suites and garden suites, and now allows multiplexes of up to four units on most residential lots. Scarborough’s wide lots often support a detached garden suite as well as an internal second unit. We prepare complete, code-compliant drawing packages.
What’s Included in a Permit Drawing Package?
- Site plan based on your legal survey - setbacks, lot coverage, and parking
- Existing and proposed floor plans with dimensions
- Exterior elevations and building cross-sections
- Structural details and, where required, P.Eng-stamped drawings
- Energy compliance (SB-12) and Schedule 1 designer information
How Much Do Permit Drawings Cost in Scarborough?
Our drawing fee depends on your project type and complexity, and is separate from the City’s permit fee. Use our permit fee calculator for the City fee, see the 2026 building permit cost guide, or call 416-558-9607 for a free quote on your Scarborough project.
City of Toronto Building Permit Fees
Because Scarborough is part of Toronto, the City’s permit fees apply. They are charged by Toronto Building and are separate from design fees. Finishing an 80 m² basement, for example, carries a City permit fee of roughly $496 (80 × $6.20).
| Scarborough project type | City of Toronto permit fee |
|---|---|
| New house – single, semi, townhouse or duplex | $18.56/m² + $56.33 per dwelling unit |
| Finished basement in a house | $6.20/m² |
| Interior alteration or renovation | $11.53/m² |
| Minimum permit fee (any project) | $214.79 |
Fees are effective January 1, 2026 and are set by the City of Toronto (Toronto Municipal Code Chapter 363). They can change — confirm current rates with Toronto Building before budgeting.
Scarborough Neighbourhoods We Serve
We prepare permit drawings throughout Scarborough, including Agincourt, Malvern, Guildwood, Birch Cliff, Cliffside, West Hill, Woburn, Bendale, Wexford, Rouge, and Highland Creek.
Why Homeowners in Scarborough Choose Ontario Design Studio
- BCIN-Certified - provincially registered, OBC-compliant drawings
- Complete submissions that reduce examiner back-and-forth and delays
- 5–10 day turnaround on most residential packages
- We manage the process - submission, examiner responses, and resubmissions
How Long Does a Scarborough Building Permit Take?
Ontario sets the review clock, not the municipality. Under the Ontario Building Code (O. Reg. 163/24), a municipality must review a complete application within a prescribed number of business days — and issue the permit or state its objections. The words that matter are complete and business days: an incomplete or wrongly formatted package never starts the clock, and a deficiency response restarts the cycle.
| Project class | Prescribed review period | Typical Scarborough example |
|---|---|---|
| House | 10 business days | Basement apartment, addition, deck, interior renovation |
| Small building | 15 business days | Small commercial unit, low-rise multi-unit |
| Large building | 20 business days | Larger commercial or industrial building |
| Complex building | 30 business days | Assembly, institutional and high-rise projects |
A complete first submission is what starts that clock in City of Scarborough. Our job is to make the first submission complete, so the statutory clock starts on day one instead of after a round of corrections. Call 416-558-9607 if you have a closing date or tenant date driving your schedule.
Get Your Free Scarborough Permit Quote
Tell us about your project — quotes go out within 24 hours of receiving your complete project information. No obligation. Fields marked * are required.
Frequently Asked Questions
Do I need a building permit for a basement apartment in Scarborough?
Yes. A second unit in Scarborough requires a City of Toronto building permit with drawings showing fire separation, egress, ceiling height and interconnected alarms. The permit and inspections are mandatory before the unit is legal.
Does building near the Scarborough Bluffs need extra approvals?
Often, yes. Lots near the Bluffs or shoreline may require geotechnical slope-stability review and a TRCA permit in addition to the building permit. We confirm whether your property is affected before starting design.
Is Scarborough part of the City of Toronto?
Yes. Scarborough amalgamated into the City of Toronto in 1998, so permits are issued by Toronto Building under Zoning By-law 569-2013 and the Ontario Building Code.
How long does a building permit take in Scarborough?
Once a complete application is filed with Toronto Building, provincial legislation targets a review of about 10 business days for a house and 15–20 for larger residential buildings. Incomplete or non-compliant drawings reset that clock, and work near the Bluffs or a ravine that needs TRCA sign-off adds time — which is why a complete first submission matters.
How much does a City of Toronto building permit cost in Scarborough?
The City charges $18.56/m² for a new house (plus $56.33 per dwelling unit) and $6.20/m² to finish a basement, with a $214.79 minimum on any permit (2026 rates). That municipal fee is separate from our design fee, which we quote per project after a free review.
Do I need a minor variance for my Scarborough project?
If the design does not meet By-law 569-2013 — for example a rear addition that exceeds lot coverage, or a garden suite closer to the lot line than permitted — you need a minor variance from the Committee of Adjustment. We flag this early so you can adjust the design or budget for the added time.
Can I build a multiplex in Scarborough?
Yes. Toronto permits multiplexes of up to four units on most residential lots city-wide, including throughout Scarborough. Each unit still needs permit drawings showing fire separation, egress and OBC compliance. We confirm what your lot and zone allow before design.
How much do building permit drawings cost in Scarborough?
Drawing fees depend on the scope of work, not on your postal code - a basement apartment package differs from a two-storey addition. Design fees are separate from the municipal permit fee. Read the 2026 building permit cost guide to see what drives the cost, or call 416-558-9607 for a fixed quote on your Scarborough project - within 24 hours of receiving your complete project information.
How fast can I get permit drawings in Scarborough?
Most Scarborough residential drawing packages are ready in 5–10 business days from the site measure. Rush turnaround is available when a closing date, a tenant or a contractor's schedule is driving the timeline - tell us the date you need and we will confirm whether we can meet it before you commit.
Do you handle the Scarborough permit submission, or just the drawings?
Both. We act as your agent: we prepare the BCIN-certified drawings, file the application through Toronto Building's online building permit application system, track it, and answer every plan examiner comment until the permit is issued. You do not have to learn the portal or interpret a deficiency notice - that is the part most homeowners find hardest, and it is included.
My Scarborough permit application was rejected. Can you fix it?
Yes - it is one of the most common reasons people call us. We read the deficiency notice, identify what actually failed (usually zoning non-compliance, a missing fire separation or egress detail, incomplete structural information, or a formatting problem caught at intake), correct the set to Ontario Building Code standards and resubmit under our BCIN. See permit rejected? we fix and resubmit or call 416-558-9607.
Do I need a BCIN designer for a Scarborough building permit?
Yes, in almost every case. Under the Ontario Building Code, permit drawings must be prepared by a designer registered under the province's Building Code Identification Number (BCIN) system, or by a licensed architect or professional engineer, and the designer's BCIN and qualified classes of design activity must be declared on Schedule 1 with the Scarborough application. The homeowner exemption is narrow and does not cover the structural and fire-separation work most second units, additions and basement entrances involve. Ontario Design Studio is BCIN-registered and verifiable through the Ministry's public QuARTS registry.
Related Services
- Legal Basement Apartment Permits
- Garden Suite & Laneway House Permits
- Our Permit Process, Step by Step
- Permit Rejected? We Fix and Resubmit
- Building Permit Drawing Cost Guide
Nearby Cities We Also Serve
Building beyond Scarborough? Ontario Design Studio prepares building permit drawings across Ontario — view every city and region we serve.